11/27/2022 0 Comments Roof crane liftWith many varieties available today, be sure to select a machine that fits the specific function and task. The site carries high-capacity lifting crane roof to move any load size with ease. On, users will find machines with suitable lifting capacity to move any load. These tools are used to carry operations in rough areas, performing activities beyond human activities. They are simple to set up and can easily navigate around spaces.Ĭhoosing the right machine can prevent potential accidents and damages in industrial environments. The machines are a popular addition to most heavy-load projects and a staple for job sites. They are crucial tools needed for almost any infrastructure project, since all construction jobs need to move heavy materials. Select from a wide variety of lifting crane roof varying by design and size for different needs. Everyone involved should be proud of this accomplishment.Įveryone should realize this is a novel and futuristic way to construct large areas of steel structure on the ground and then lift the entire assembly into place.On, shoppers can get beautiful lifting crane roof offering exceptional lifting capabilities at cost-effective prices. This project is an example of a rigging ballet made possible by the coordinated efforts of the people involved to synchronize the rigging and movement of the ten cranes. Two Pinnacle Riggers worked each side of the load with our Virginia SLINGMAX® Product advisors, Selina Kochel and Pauline Scites. Wire rope slings would have required several days to connect, many extra workers, and at least one extra crane.Ĭonnection of the Twin-Path® Extra slings, and CornerMax® Pads to lift the load required six people working for three hours. Total rigging weight was reduced by 10,000 lbs using the SLINGMAX® Innovations instead of traditional steel products. The heaviest Twin-Path® Extra slings weighed 100 lbs replacing wire rope slings that would have weighed 745 lbs. However, the miracle of the CornerMax® Product that softens contact and the lightweight but strong Twin-Path® Extra slings enable the workers to perform their rigging tasks quickly and safely. The edges of the heavy steel beams would normally preclude the use of synthetic slings because of the danger associated with cutting. In addtion 70 CornerMax® Pads were supplied to ensure correct use of the sling and to prevent any sling damage during this lift.Īlso, 6 Shackle Pin pads to fit 85 ton shackles were provided. The Twin-Path® Extra slings consisted of the following:Ħ- TPXC 12,500 x 35′ with K-Spec® Core YarnĦ- TPXC 12,500 x 15′ with K-Spec® Core YarnĨ- TPXC 7,000 x 35′ with K-Spec® Core Yarnġ- TPXC 7,000 x 15′ with K-Spec® Core Yarnġ- TPXC 5,000 x 14′ with K-Spec® Core Yarn The entire structure was fabricated on the ground for safety and ease of assembly. The dimensions of the steel lifted in one piece were 50 meter (165′) wide by 61.5 meters (202′) long. The area of steel is approximately 75% of a football field. The job site was the Dulles International Airport outside of Washington, DC and the structure erected is an airplane hanger roof support. The work was performed by Pinnacle Erectors of Pinnacle, North Carolina using ten cranes supplied by W. The patented products involved are SLINGMAX® Solutions sold by the Lorton, Virginia plant of SLINGMAX. This is the heaviest lift using High Performance Synthetic Slings and Synthetic Pads. This single 703,000 lb (351 Tons) lift of structural steel using Twin-Path® Extra Slings with CornerMax® Pads and Shackle Pin Pads for protection, established a new record.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |